Caymus Processing Complex
The Vaquero system currently consists of 400 MMscf/d of processing capacity which are both in service with expansion capacity of 1 BCFD on current site. The entire facility provides producers with quick ramp-up capabilities. This high-quality, new-build system is designed to meet the takeaway constraints in the region and provides higher plant recoveries, minimal downtime, and lower fuel usage. Strategically located near the Waha market, the intentional facility footprint ensures multiple takeaway options to producers.
Our system provides the efficiency, safety, and reliability our customers demand – and the innovative solutions that the market needs.
Midstream Solutions
Current Cryogenic Processing Capacity | 400 MMcf/d |
Site Processing Capacity Currently Under Construction | Caymus III will begin construction when volumes dictate. Cryo plant and long lead items currently in inventory. 309 acre site with room to add Caymus Plant III and two additional trains, with ability to reach 1 Bcf/d total processing capacity |
High Pressure Rich Gas Pipeline | Over 165 miles |
Pipeline Diameter | 12″ – 30″ |
Inlet Liquids Handling Capacity | 7,500 BPD |
Condensate Stabilization Capacity | 15,000 BPD |
Compression | > 79,000 HP / Field Compression |
Residue Gas Pipeline Outlets | Seven direct interconnects with access to over 12 pipelines and downstream markets |
NGL Outlets | Currently connected to 4 pipelines |
Treating | 800 GPM @ Caymus I and 400 GPM @ Caymus II |