Caymus Processing Complex

The Vaquero system currently consists of 400 MMscf/d of processing capacity which are both in service with expansion capacity of 1 BCFD on current site. The entire facility provides producers with quick ramp-up capabilities. This high-quality, new-build system is designed to meet the takeaway constraints in the region and provides higher plant recoveries, minimal downtime, and lower fuel usage. Strategically located near the Waha market, the intentional facility footprint ensures multiple takeaway options to producers.

Our system provides the efficiency, safety, and reliability our customers demand – and the innovative solutions that the market needs.

Midstream Solutions

Current Cryogenic Processing Capacity400 MMcf/d
Site Processing Capacity
Currently Under Construction
Caymus III will begin construction when volumes dictate. Cryo plant and long lead items currently in inventory.

309 acre site with room to add Caymus Plant III and two additional trains, with ability to reach 1 Bcf/d total processing capacity
High Pressure Rich Gas PipelineOver 165 miles
Pipeline Diameter12″ – 30″
Inlet Liquids Handling Capacity7,500 BPD
Condensate Stabilization Capacity15,000 BPD
Compression> 79,000 HP / Field Compression
Residue Gas Pipeline OutletsSeven direct interconnects with access to over 12 pipelines and downstream markets
NGL OutletsCurrently connected to 4 pipelines
Treating800 GPM @ Caymus I and 400 GPM @ Caymus II
vaquero logo

Dallas Office | (214) 329-9920

Harwood No.10
2850 N. Harwood Street, Suite 1200
Dallas, TX 75201

Midland Office |

306 W. Wall Street
Suite 650
Midland, TX 79701

Monahans Office | (432) 203-8060

323 Private Road 42
Monahans, TX 79756

Every dig requires a call.

811 “Call Before You Dig” was created to provide you with a nationwide, easily accessible resource when you are digging.

LEARN MORE